Performance
Testing a strategy on data that was never used to design or adjust it — the only kind of backtest result that says anything about the future.
Split the history before starting: one part to design and compare changes, one part kept unseen and run exactly once at the end. A result on the design data partly measures how well the rules were fitted to it.
Also called: out-of-sample, unseen data.
Taught in
We Backtested It: The VP StrategyStrategy PlaybookThe volume profile rules from the Reel, coded and tested on 21 months of US30 — why they lost, what we changed, and how we tested without fooling ourselves.
Also covered in that lesson
Related terms